Following a fire in the electrical board which controls the conveyor belt for the quarry, an urgent intervention was performed to replace all damaged material.
The new system was connected to the old recoverable system.
- Electrical components sizing
- Replacement and installation of all damaged electrical components
- Installation of a new belt controller
- Performance testing in all belt machines
- Belt start-up